CNOOC has announced the results of its latest centralized tender for n-type solar panels. Yingli secured the qualification of the first winning bidder with a unit price bid of CNY0.84 ($0.12)/W, followed by Trina Solar and Das Solar. The total bid was 790 MW, excluding 580 W n-type monocrystalline bifacial modules.
GCL Perovskite has begun construction of a large-scale commercial production base for gigawatt-scale perovskite modules in Kunshan, Jiangsu Province. The manufacturing base will focus on the production of large-scale commercial perovskite tandem modules with an area of 2.88 square meters (1.2 meters x 2.4 meters) – currently the largest perovskite modules in the world, with the highest conversion efficiency. The CNY570 million project will be implemented in two phases, with the first phase covering a construction area of 120,000 square meters.
This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.